Project: ABN AMRO, London
Location: 250 Bishopsgate
System: CO2 Mission Critical Cooling
M&E Services Consultant: Norman Disney & Young
Main Contractor: Mitie
Contractor: TROX/Star Refrigeration
The installation at 250 Bishopsgate in London was completed in April 2006. The system, installed in the live data centre, comprises of two (N+N) chilled water (6/12oC) cooled CO2 plant (CO2OLpac™) both running at 50% duty, stainless steel secondary CO2 distribution pipework, gas detection/isolation and cabinet coolers type CO2OLrac™. The system provides 300kW of cooling, via 15off 20kW CO2OLrac™ units.
The units were supplied as a customised solution to suit the bank’s existing 600mm x 42U high cabinets; providing full access to the rear of the server cabinets.
The high capacity solution will provide cooling for the latest in server technology – Blade Servers.