ABN AMRO London


ABN AMRO, London

 

Project: ABN AMRO, London

Location: 250 Bishopsgate

System: CO2 Mission Critical Cooling

M&E Services Consultant: Norman Disney & Young

Main Contractor: Mitie

Contractor: TROX/Star Refrigeration

 

The installation at 250 Bishopsgate in London was completed in April 2006. The system, installed in the live data centre, comprises of two (N+N) chilled water (6/12oC) cooled CO2 plant (CO2OLpac) both running at 50% duty, stainless steel secondary CO2 distribution pipework, gas detection/isolation and cabinet coolers type CO2OLrac. The system provides 300kW of cooling, via 15off 20kW CO2OLrac units.

The units were supplied as a customised solution to suit the bank’s existing 600mm x 42U high cabinets; providing full access to the rear of the server cabinets.

The high capacity solution will provide cooling for the latest in server technology – Blade Servers.

Download PDF Project leaflet

Contact

Thetford Main Offices Small

TROX AITCS Ltd

Caxton Way, Thetford
Norfolk IP24 3SQ
Tel: +44 (0) 1842 851 280